Exchanges
Route status
Live RDAC deposit and withdrawal status on the BASE network at MEXC, with fee, confirmations, and 30-day uptime.
RDAC deposits are closed and withdrawals are open on the BASE network at MEXC.
MEXC currently charges 8 RDAC to withdraw on the BASE network.
MEXC requires 1800 confirmations on the BASE network for RDAC deposits to credit.
Cexorer recorded 1 outages on the RDAC BASE route at MEXC in the past 30 days, totaling roughly 43200 minutes of downtime.