Exchanges
Route status
Live CDL deposit and withdrawal status on the BEP20 network at MEXC, with fee, confirmations, and 30-day uptime.
CDL deposits are closed and withdrawals are open on the BSC network at MEXC.
MEXC currently has no withdrawal fee for CDL on the BSC network.
MEXC requires 61 confirmations on the BSC network for CDL deposits to credit.
Cexorer recorded 2 outages on the CDL BSC route at MEXC in the past 30 days, totaling roughly 43228 minutes of downtime.