Exchanges
Route status
Live ORB deposit and withdrawal status on the ETH network at HTX, with fee, confirmations and 30-day uptime.
ORB deposits are closed and withdrawals are open on the ETH network at HTX.
HTX currently charges 1202.9106 ORB to withdraw on the ETH network.
HTX requires 64 confirmations on the ETH network for ORB deposits to credit.
Cexorer recorded 1 outages on the ORB ETH route at HTX in the past 30 days, totaling roughly 30 days of downtime.