Exchanges

Route status

GORILLA on the ETH network at BitMart

Live GORILLA deposit and withdrawal status on the ERC20 network at BitMart, with fee, confirmations, and 30-day uptime.

Withdraw fee
7121 GORILLA
Min withdrawal
35590.84595578 GORILLA
30-day outages
2(1440h total downtime)

Route availability — right now

GORILLA · ETH · BitMart
Deposit
Closed
Withdraw
Closed

Route specs

Withdraw fee 7121 GORILLA
Min withdrawal 35590.84595578 GORILLA
Contract address (ETH) 0x33C04Bed4533e31f2Afb8AC4a61A48Eda38C4fA0

30-day availability

0% deposit uptime 0% withdraw uptime 2 outages · 1440h total
Deposit
Withdraw
30d ago20d ago10d agotoday

30-day outage history

1440h total downtime
Deposit · GORILLA · ETH Mar 21, 2026 17:43 UTC
ongoing
Withdraw · GORILLA · ETH Mar 21, 2026 17:43 UTC
ongoing

GORILLA · ETH on other exchanges

Exchange Deposit Withdraw Fee Fee (USD)
MEXC off on

Frequently asked

Are GORILLA ETH deposits and withdrawals working on BitMart right now?

GORILLA deposits are closed and withdrawals are closed on the ETH network at BitMart.

What is the GORILLA ETH withdrawal fee on BitMart?

BitMart currently charges 7121 GORILLA to withdraw on the ETH network.

How often has the GORILLA ETH route been suspended on BitMart in the past 30 days?

Cexorer recorded 2 outages on the GORILLA ETH route at BitMart in the past 30 days, totaling roughly 86400 minutes of downtime.